1. Railroad Photography
  2. Revenue Freight and Passenger Service

New Hampshire

Read More
Amtrak Downeaster 681 is seen heading through Exeter, NH on its trip from Boston, MA to Brunswick, ME with one of the 50th-anniversary heritage units on point, 5-18-22.
2 / 67

Amtrak Downeaster 681 is seen heading through Exeter, NH on its trip from Boston, MA to Brunswick, ME with one of the 50th-anniversary heritage units on point, 5-18-22.

  • Pan Am ran an extra train from Boston to Brunswick using a CSX F40 and a lone coach. The Dash 8 was on the point due to PTC requirements. The train was carrying CSX executives and is seen at Powder Mill Road in Exeter, NH, 5-18-22.
  • Amtrak Downeaster 681 is seen heading through Exeter, NH on its trip from Boston, MA to Brunswick, ME with one of the 50th-anniversary heritage units on point, 5-18-22.
  • New Hampshire Northcoast train D8 is seen pulling onto Pan Am trackage passing under Boston & Maine searchlight signals at CPF-241 in Rollinsford, NH. The train has 25 aggregate loads for Boston along with four empty tank cars to be set out in Dover, 4-4-22.
  • New Hampshire Northcoast train D8 is seen switching aggregate cars at Tri-City in Rochester., 4-4-22.
  • New Hampshire Northcoast train D8 is seen switching aggregate cars at Tri-City in Rochester., 4-4-22.
  • New Hampshire Northcoast train D8 is seen switching aggregate cars at Tri-City in Rochester., 4-4-22.
  • Although I had intended on shooting the signature shot at Willey Brook Bridge as the forecast called for clouds, I was met with abundant sunshine on my arrival to the White Mountains. After shooting the 1 pm Hobop Railroad train on the way up, I decided to still hike into Willey and see if the weather changed. Since the bridge was fully shadowed, I figured that I would try something different this year. The train is rounding Hangman's Curve, just West of Willey Brook Bridge amid peak foliage, 10-13-21.
  • New Hampshire Northcoast train D-8 is seen departing Tri-City in Rochester with a cut of sand loads for Boston Sand & Gravel. The train originated in Ossipee and is bound for the interchange with Pan Am at Dover, 10-7-21.
  • New Hampshire Northcoast train D-8 is seen passing over the Union Meadows Dam in Union New Hampshire with a string of sand loads bound for Boston Sand & Gravel. The train will drop a cut at Tri-City in Rochester before continuing to the interchange with Pan Am in Dover, 10-7-21.
  • New Hampshire Northcoast D8 is seen passing Jones Forest with 32 loads of sand from the pit. Seven loads will be dropped at Tri-City in Rochester with the remaining heading to Boston Sand & Gravel, 9-8-21.
  • New Hampshire Northcoast D8 is seen passing Union Meadows with 32 loads of sand from the pit. Seven loads will be dropped at Tri-City in Rochester with the remaining heading to Boston Sand & Gravel, 9-8-21.
  • The New Hampshire Northcoast crew is getting ready to leave Ossipee Aggregates with thirty-two loads. They are about to pull twenty-five loads up the hill before coming back for seven more. The seven will go to Tri-City in Rochester while the twenty-five will go to Boston Sand & Gravel, 9-8-21.
  • The New Hampshire Northcoast crew is getting ready to leave Ossipee Aggregates with thirty-two loads. They are about to pull twenty-five loads up the hill before coming back for seven more. The seven will go to Tri-City in Rochester while the twenty-five will go to Boston Sand & Gravel, 9-8-21.
  • New Hampshire Northcoast train D7 is seen arriving back at the pit in Ossipee with another cut of empty sand hoppers to be refilled and sent South to Boston, 8-6-21.
  • New Hampshire Northcoast train D7 is seen arriving back at the pit in Ossipee and getting another cut of loaded sand hoppers to be added to the next train to Boston, 8-6-21.
  • New Hampshire Northcoast train D7 is seen crossing Province Lake Road in Wakefield on the old Boston & Maine Conway Branch. The train is taking empty sand hoppers to be reloaded at the Ossipee Aggregates pit, 8-6-21.
  • The New Hampshire Northcoast crew is seen departing Try-City in Rochester after adding cars to their train. The railroad operates on the old Boston & Maine Conway Branch. The train, symboled D7 is headed back to the sandpit in Ossipee for another string of loads for Boston Sand & Gravel, 8-6-21.
  • The New Hampshire Northcoast crew is seen taking the empty hoppers out of Dover and hooking a left on the old Boston & Maine Conway Branch. The train is headed back to the sandpit in Ossipee for another string of loads for Boston Sand & Gravel, 8-6-21.
  • The New Hampshire Northcoast crew is seen taking the empty hoppers out of Dover and hooking a left on the old Boston & Maine Conway Branch. The train is headed back to the sandpit in Ossipee for another string of loads for Boston Sand & Gravel, 8-6-21.
  • The New Hampshire Northcoast crew is seen taking the empty hoppers out of Dover and hooking a left on the old Boston & Maine Conway Branch. The train is headed back to the sandpit in Ossipee for another string of loads for Boston Sand & Gravel, 8-6-21.
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2022 SmugMug, Inc.